Jump to content




Welcome to Unexplained Mysteries! Please sign in or create an account to start posting and to access a host of extra features.


- - - - -

Orion Teamwork Pays Off

orion space launch system sls eft-1 nasa

  • Please log in to reply
No replies to this topic

#1    Waspie_Dwarf

Waspie_Dwarf

    Space Cadet

  • 34,221 posts
  • Joined:03 Mar 2006
  • Gender:Male
  • Location:Bexleyheath, Kent, UK

  • We are all in the gutter, but some of us are looking at the stars.

    Oscar Wilde

Posted 15 January 2013 - 12:37 AM

Orion Teamwork Pays Off


www.nasa.gov said:

Image above: Inside the Operations and<br />
Checkout Building, a birdcage tool along<br />
with work platforms surround the Orion<br />
Exploration Flight Test 1 crew module.<br />
Image credit: NASA/Charisse Nahser<br />
<a href='http://www.nasa.gov/images/content/718751main_orion1-lg.jpg' class='bbc_url' title='External link' rel='nofollow external'> View larger image</a>
Image above: Inside the Operations and
Checkout Building, a birdcage tool along
with work platforms surround the Orion
Exploration Flight Test 1 crew module.
Image credit: NASA/Charisse Nahser
View larger image
Using its experienced workforce and state-of-the-art facilities, NASA's Kennedy Space Center in Florida is working with private companies to ensure the future of U.S. space exploration stays on course. By bringing contracted work to Kennedy, NASA is providing a means to expedite Orion work from months to build and ship across the nation, to mere days.


NASA employees and Lockheed Martin contractors are working side by side in a revamped area of Kennedy's Operations and Checkout Building. Their goal is to prepare NASA's Orion spacecraft for its first launch, Exploration Flight Test-1, or EFT-1, in 2014. Orion is designed to take American astronauts farther into space than ever before.


Colocating contractors on-site provides the advantage of having center personnel and facilities readily available. Because of this cooperative effort, the Orion team is achieving its scheduled milestones for assembly and checkout of the spacecraft ahead of schedule.


Image above: Inside the Operations and<br />
Checkout Building high bay, a technician<br />
attaches a crane to the Orion Exploration<br />
Flight Test 1 crew module so that it can<br />
be moved.<br />
Image credit: NASA/Kim Shiflett<br />
<a href='http://www.nasa.gov/images/content/718759main_orion2-lg.jpg' class='bbc_url' title='External link' rel='nofollow external'> View larger image</a>
Image above: Inside the Operations and
Checkout Building high bay, a technician
attaches a crane to the Orion Exploration
Flight Test 1 crew module so that it can
be moved.
Image credit: NASA/Kim Shiflett
View larger image
"This new and unique working relationship, in essence having a Lockheed Martin factory within a NASA facility, has allowed us to leverage Lockheed's strength in building spacecraft and the strength of our Kennedy workforce in providing world-class services and facilities," said Scott Wilson, manager of production operations for the Orion Program, and the offline processing and infrastructure development for the Ground Systems Development and Operations Program.


In preparation for EFT-1, a number of processing milestones have been set to make sure the spacecraft is ready for launch. Engineers and technicians from a number of different areas at Kennedy are lending their help by providing solutions to issues that arise during the on-site assembly and preparation.


Upcoming milestones will include testing the structure of the crew module, powering up the vehicle for the first time, completing the assembly and subsystem installations for the crew module, service module and launch abort system, and finally, joining the crew and service modules together.


"We are extremely proud of the exceptional effort the team has demonstrated in preparing the Orion crew module for a recent critical pressurization test. This test was a key milestone in our march toward orbital flight in 2014," Wilson said.


Image above: The Orion Exploration Flight<br />
Test 1 crew module undergoes proof<br />
pressure testing at the Operations and<br />
Checkout Building.<br />
Image credit: NASA/Ben Smegelsky<br />
<a href='http://www.nasa.gov/images/content/718759main_orion2-lg.jpg' class='bbc_url' title='External link' rel='nofollow external'> View larger image</a>
Image above: The Orion Exploration Flight
Test 1 crew module undergoes proof
pressure testing at the Operations and
Checkout Building.
Image credit: NASA/Ben Smegelsky
View larger image
The materials and processing division possesses numerous capabilities that provide unique solutions to unusual or urgent problems that arise during spacecraft preparation. One example comes from the Space Shuttle Program.


"One of the unique capabilities here at Kennedy is the ability to fabricate, install and repair thermal tiles," said Terri Holbert, project lead engineer for Assembly, Integration and Production. "The team that performed this work for the space shuttle is now executing the tile build for Orion."


Other areas that have contributed to Orion's preparation are labs that offered dimensional analysis of hardware, materials testing and evaluation, and chemical analysis; a prototype shop that provided mechanical design, fabrication and rapid prototyping; and the Launch Equipment Test Facility that executed a pyrotechnics test on the tiles.


In the end, the ultimate goal is Orion's uncrewed flight test aboard a Delta IV Heavy rocket. The flight will take the spacecraft on a two-orbit journey, reaching an altitude of about 3,600 miles above the Earth's surface -- more than 15 times farther than the International Space Station's orbital position -- and sending it farther than any human-rated spacecraft has gone since the Apollo program.
<br />
Image above: The Orion Exploration Flight<br />
Image above: Jim Niehoff, a Mechanical<br />
Engineering Technician with the NASA<br />
Prototype Development Laboratory, is one<br />
of many Kennedy Space Center employees<br />
working alongside Lockheed Martin to<br />
ensure the future of U.S. space exploration.<br />
Image credit: NASA/Jim Grossmann<br />
<a href='http://www.nasa.gov/images/content/718768main_JimNiehoff.jpg' class='bbc_url' title='External link' rel='nofollow external'> View larger image</a>

Image above: The Orion Exploration Flight
Image above: Jim Niehoff, a Mechanical
Engineering Technician with the NASA
Prototype Development Laboratory, is one
of many Kennedy Space Center employees
working alongside Lockheed Martin to
ensure the future of U.S. space exploration.
Image credit: NASA/Jim Grossmann
View larger image



















Cheryl L. Mansfield
NASA's John F. Kennedy Space Center



Posted Image Source


Edited by Waspie_Dwarf, 28 February 2014 - 10:46 PM.
corrected tags.

"Space is big. Really big. You just won't believe how vastly, hugely, mind-boggingly big it is. I mean, you may think it's a long way down the street to the chemist, but that's just peanuts to space." - The Hitch-Hikers Guide to the Galaxy - Douglas Adams 1952 - 2001

Posted Image
Click on button




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users