Second stage engine shut down completed as planned! Electron is in orbit and the Kick Stage now takes over the mission with PREFIRE-2 still attached. Target orbit: 525km. Right now though we're in a coast phase ahead of payload deployment around 40 mins from now.

— Rocket Lab (@RocketLab) June 5, 2024