Jump to content
Join the Unexplained Mysteries community today! It's free and setting up an account only takes a moment.
- Sign In or Create Account -

Model maker recreates Star Trek bridge set


Still Waters

Recommended Posts

One model maker could have reached the final frontier of construction with his latest work.

Geoff Collard, from Paulton in Somerset, has spent 500 hours recreating the bridge set from Star Trek: The Next Generation.

His model has won praise from Star Trek fans for its realism.

https://www.bbc.co.uk/news/av/uk-england-somerset-53027882/star-trek-next-generation-fan-rebuilds-bridge-set

  • Like 6
Link to comment
Share on other sites

 

Impressive!

  • Like 4
Link to comment
Share on other sites

Oh wow, the detail is incredible. I don't have the patience to put a five-piece puzzle together, let alone anything that complex.

  • Like 3
Link to comment
Share on other sites

Wow.  I work in the biz and I've worked on the Trek franchise (the first JJ Abrams film), and what Mr Pollard achieved is really impressive. I suspect he's a miniature pro already working in film.

On a show of that magnitude, we generally work seven 12 hour shifts a week until the set is complete.  My longest stint in a row was 87 days, for a show called Jericho.

At that rate he completed that model by himself from scratch in just under 6 weeks.

With those skills, Geoff could step right in on our crew with us, hold his own and work on the real thing if he was inclined. 

  • Like 4
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.